Hardcore is laid to a minimum
100mm deep and compacted to
form the base of the slab.
A blinding screed of sand is
laid over the hardcore to prevent
any sharp stones puncturing the
damp proof membrane.
A visquen damp proof membrane is
laid over the sand blinding and
lapped onto the inner leaf of brickwork.
Optional floor insulation may be
installed at this stage
Concrete 100mm thick is laid to bring
the slab up to the finished floor level.
The concrete is floated to a
smooth level surface, suitable
for tiling. Usually if you wish
to lay a carpet then a screeded
floor finish or self levelling
compound is added to the floor
after the conservatory is erected.
The outer leaf of the wall
is built. In this case, artifical
stone to match the house is used.
The inner leaf of the cavity
wall is built to complete
the basework. The same material
as the outer leaf has been used
to provide a feature stone finish

WITH 30 YEARS BUILDING EXPERIENCE YOU KNOW YOU'RE IN GOOD HANDS

BACK
TELEPHONE- (01383)734532
EMAIL- info@sandgbuilders.com

House Build Driveways Garden Walls Paving Completed Projects Extension
Conservatory Bases About Us Contact Us A-Z Glossary Links


Copyright © 2005-2011 S. & G.Builders All Rights Reserved.