CONSERVATORY BASE CONSTRUCTION

The site of the
proposed conservatory
The ground is excavated to a
minimum of 450mm deep for the
footings. Excavation exposes an
underground drainage pipe in this
example.
Additional steel mesh reinforcement
is introduced to the concrete
foundation to prevent the drainage
pipe being crushed. Another alternative
is to insert concrete lintels above the
drain in order to bridge it.
Concrete is poured into the
trench to form the foundations.
The concrete is a minimum of
150mm thick
The concrete is floated to form a level
surface to build upon.
The inner leaf of the cavity wall
is built up to floor level